![]() ![]() Now if I include the width of the adjacent perpendicular wall (5.5") plus the distance to the middle of the second stud (18.5"), I get a stud 24" away from the corner which lines up with the 2nd story floor joist, second story wall stud, and roof truss. Press and hold Shift to lock the direction of the Move and then move the cursor to the bottom of the other object. Grab the selection at a point along the bottom and start moving it in the blue direction. ![]() For example, and for a 2圆 wall with stud spacing of 24" and a wall placed inside a perpindicular adjacent wall, I want to place the middle of the second stud at 18.5" in from the end of the wall. Select the object you wish to move and get the Move tool. Unfortunately, I don't see a way to set an offset where to place the second stud within a wall. This means that wall studs need to be spaced appropriately to line up with members above. Advanced Framing or Optimum Value Engineering (OVE) uses stacked framing with single top plates such that trusses line up with 2nd story wall studs, which line up with 2nd story floor joist, which line up with 1st floor wall studs such that loads are transferred directly down through the structure. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |